Thursday 26 April 2018

Filming Day 7

On this day myself, Kaan and Jack went to the drama room after school and re filmed some of the footage we required to after some feedback from our first draft of our music video. We filmed scenes using one big light and all the surrounding lights in the room turned off. This was so we can keep in theme within the genre our music video is. We used a camera, light and tripod. We also took pictures for our poster after we finished filming.

Wednesday 25 April 2018

Filming Day 6

On this day myself, Kaan and Jack went to Danson Park in order to film some more footage in preparation for our final draft of our music video. We filmed some close ups, medium shots and long shots and this was in response to our feedback from our classmates when we screened our first draft.

Image result for danson park

Monday 23 April 2018

First Draft

This is our first draft for the music video Heathens by DAZE. 





Friday 20 April 2018

Filming Day 5

On Tuesday 13th, in preparation for the screening of the first draft.  myself and Jack went to one of the drama rooms in school to try and film some more lip syncing shots of Jack. I took the role of cinematographer and Jack took the role of costume, props and location.

Filming Day 4

On Wednesday 7th March, myself, Kaan and Jack went to Camden Town to film some shots of DAZE for our music video. Jack took the roles of being in the video, costume, props, location and part director, I took the role of cinematographer and Kaan was also part director.

 Image result for camden lock           Image result for jubilee line







Music Video